Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13666298

- Product Categories
- Friendly Links
Information Name: | The decompression device inside the dome of how the various components work |
Published: | 2015-03-13 |
Validity: | 30 |
Specifications: | |
Quantity: | 10.00 |
Price Description: | |
Detailed Product Description: | Internal pressure ball machine equipment components of the work process: a conveyor operating pressure ball machine equipment: First adjust the center bracket so that the bracket and the conveyor frame fastening bolts good. For the tape interface and the tape edge staple line connection position. Second, adjust conveyor belt tightness requirements conveyor belt close to the bottom bracket to move the roller along. Adjust the tightness of the conveyor belt, requires close below the conveyor belt to move the roller along the bracket. Finally, turn the empty machine test, to see if there is deviation phenomenon. Second, the encryption machine debugging process work pressure ball machine equipment: Zhengzhou Plains coal machinery factory made, adjust belt tightness, tightness requirements; two roll gap adjustment, by or under the pressure put on the wedges. Empty commissioning, without exception after the start of feeding trial load; observe the state of press materials, should be flaky MASSIVE, pinching feeling a certain strength, force can not powdery. Third, the pressure ball machine equipment, electrical wiring must have completed a full-time electrician. Check all electrical components switchboard connection. To see if there are loose pile head. To see whether the components connected to a wired connection between the first ride, the mains power is turned on while the ground unit. After switching on all electrical power equipment, such machines do not hang empty motor Trial belt, to ensure consistent steering motor turning the device, and then put on trial transfer belt were empty machine. Single idle until everything is normal, try entering the entire line of empty machine turn. When loads are transferred, to view each instrument eat overload conditions on the power strip. www.hndfzg.cn coal briquetting machine www.dondfang.cn drying equipment www.henandf.com ball press machine www.jqz3.com powder ball press machine |
Admin>>>
You are the 4440 visitor
Copyright © GuangDong ICP No. 10089450, Zhengzhou Dongfang Heavy Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4440 visitor
Copyright © GuangDong ICP No. 10089450, Zhengzhou Dongfang Heavy Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility